Warp Monitoring
Warp Stop Motion
Warp stop motion parts detect a broken warp end and stop the loom, preventing fabric faults.
01 / Product Records
Parts listed under Warp Stop Motion
Product references recorded for this product type, with company code, foreign code and material. Open the full product list to filter by machine model.
No product records listed yet
Send us the machine model, existing part number or a drawing and we will confirm the reference, material and reference lead time for your enquiry.
Request a QuoteFunction & Production
About Warp Stop Motion
The warp stop motion uses droppers on electrified bars. When a warp end breaks, the dropper drops and the machine stops.
We supply stop motion bars, droppers, insulating and contact elements, brackets and connecting parts for weaving looms.
Bar sections are straightened and contact surfaces are finished to keep the electrical signal stable over long running periods.

Reference Specification
- Bar Material
- Steel with insulating sections
- Dropper Weight
- Selected by warp count and yarn type
- Contact Surface
- Finished for stable electrical contact
- MOQ
- 100 pcs (droppers), 20 pcs (bars)
- Lead Time
- 15 days (reference, subject to confirmation)
Values above are reference data. Final material, tolerance and lead time are confirmed in writing after drawing review.
02 / Components
What this product type is built from
Each group below can be supplied separately or as a complete assembly, produced to the machine reference.
Stop Motion Bars
Electrified bars that carry the droppers.
Droppers
Weighted elements that fall when a warp end breaks.
Insulators & Contacts
Parts that separate and connect the bar circuits.
Brackets & Fixings
Mounting hardware matched to the loom frame.
03 / Applicable Machines
Machine models that use Warp Stop Motion
Open a machine page to see the full component range we supply for that model.
04 / Related Types
Other accessory groups
Enquire about Warp Stop Motion
Send the machine model, part number or a photo with dimensions. We confirm compatibility, material grade and reference lead time within 1 business day.




